Go To Search
EmailPrintFacebookTwitterYouTubeRSS
Click to Home
Before/After Hours Construction
Before or After Hours Construction Permits

The Police Chief has the authority to authorize emergency construction work that exceeds the Town's noise level limitations and hours of construction regulations. Requests are reviewed on a case by case basis and are typically for construction work that requires continuous work that cannot be delayed once it starts - such as concrete pours.

When permitting work, the contractor shall be required to notify all neighbors abutting the subject parcel along with those parcels directly across the street at least 72 hours in advance of the scheduled work. If the 72 hour advance notice is not possible due to the date of the issuance of the exemption, the contractor shall immediately upon approval of the exemption, notify surrounding residents of the scheduled work. Failure to notify surrounding residents may prevent future exemption approvals.   


Below is a list of permits issued pursuant to the above:
  • November 17, 2017 @ 7:00 a.m.-6:00 p.m. - Polhemus Ave - swimming pool resurface
  • November 17, 2017 @ 7:00 a.m.-6:00 p.m. - 1 Toyon Dr - concrete pour
  • November 20, 2017 @ 6:00 a.m.-6:00 p.m. - 89 Mercedes Ln - swimming pool resurface
  • December 9, 2017 @ 7:00 a.m.-5:00 p.m. - 150 Valparaiso Ave - large delivery
  • December 16, 2017 @ 7:00 a.m.-5:00 p.m. - 150 Valparaiso Ave - large delivery