- Home
- Town Government
- Departments
- Building
- Submittal Checklist
Submittal Checklist
General Requirements
- Demolition Permit Submittal Requirements (PDF)
- Generator Permit Submittal Requirements (PDF)
- Grading and Drainage Checklist (PDF)
- Menlo Park Fire Submittal Requirements (PDF)
- Plan Submittal Checklist (PDF)
- Swimming Pool Demolition Checklist (PDF)
- Swimming Pool Submittal Package (PDF)
- Tree Protection Plan Submittal Checklist (PDF)
- Water Well Submittal Checklist (PDF)
Landscape Screening
Tree Protection
All trees to be preserved shall be protected with 6 feet high, minimum 12 gauge chain link fence. Fences are to be mounted on 2-inch diameter galvanized iron posts, driven into the ground to a depth of at least 2 feet at no more than 10 feet spacing. This detail shall appear on grading, demolition and building permit plans.
Tree Preservation Guidelines Standards and Specifications (PDF)
Tree Protection Zone Warning Sign (PDF)
Tree Protection During Construction Acknowledgement (PDF)
Tree Protection Plan Review Requirements (PDF)
Landscape Water Efficiency Requirements
FAQ: How do I know which WELO Standards apply to my project?
First determine which set of standards apply then go to those standards to see if your project falls within the scope. When a project has a permit issued such as a structure or grading/drainage and landscaping is to be installed it is the application date of the permit for the structure or grading/drainage permit that will trigger which standards apply. If the triggering permits application date is on or after December 1, 2015 the 2015 WELO requirements apply. A project with a permit application date prior to December 1, 2015 will fall under the 2010 WELO Standards.
Example: A new residence is applied for on December 1, 2015 but issued at a later date. This project will fall under the 2015 Standards. Conversely if the residence was applied for on November 30, 2015 then the 2010 WELO Standards will apply.
2015 WATER EFFICIENT LANDSCAPE REQUIREMENTS:
- 2015 WELO DWR Landscaping Efficiency Guidelines (PDF)
- 2015 DWR TITLE 23 Extract State Law (PDF)
- 2015 WELO DWR APPENDIX B Water Efficient Landscape Worksheet (PDF)
- 2015 WELO DWR APPENDIX C Certificate of Completion (PDF)
- 2015 WELO DWR APPENDIX D Prescriptive Compliance option less than 2500 SF (PDF)
- STATE MWELO 2015 REVISION FACT SHEET (PDF)
- 2015 Landscaping Efficiency Plan Requirements (PDF)
- 2015 Landscaping Efficiency Submittal Checklist (PDF)
Construction Operation and Parking
- Construction, Operations and Parking Plan Guide (PDF)
- Construction Operations and Parking Plan (PDF)
- Construction and Delivery Hours and Holidays (PDF)
Construction & Demolition Recycling Forms
- Recycling and Waste Calculator for New Construction, Additions, Remodels and Re-Roof Projects (PDF)
- Recycling and Waste Calculator for General Demolition and Pool Demolition (PDF)
- Construction and Demolition Waste Reduction Plan Waiver (PDF)
- Construction and Demolition Recycling Criteria and General Information (PDF)
- Construction and Demolition Salvage Inventory Sheet (PDF)
- Construction and Demolition Recycling Diversion Summary Sheet (PDF)
- Recycling Resources (PDF)